AGE CCPP
| CLIENT | : | AGE Enerji ve Yatirimlari A.S. (www.age.com.tr)
|  |
| PROJECT | : | 200 MW Natural Gas Fired Combined Cycle Power Plant |
| LOCATION | : | Saraykoy, Denizli, Turkey |
AGE signed an agreement with ENPRODE Engineering in June 2010 for Design, Engineering, Procurement and Construction Management (EPCM) of all project phases from the conceptual design up to commercial start up of their 200 MW Natural Gas Fired Combined Cycle Power Plant investment.
The Power Plant will be constructed on the land owned by AGE located in Saraykoy, which is a town 22 km away from Denizli. Its design will be based on Gas Turbine Combined Cycle technology and the Plant will consist of three Gas Turbines, three Heat Recovery Steam Generators (HRSG), one Steam Turbine and one Air Cooled Condenser (ACC) in accordance with equipment performance.
|
|