BOSEN CCPP (Bursa Organized Industrial Zone)
|
| CLIENT | : | BOSEN Enerji Elektrik Uretimi A.S. |  |
| PROJECT | : | 120 MW Natural Gas Fired Combined Cycle Power Plant |
| LOCATION | : | Bursa Organized Industrial Zone , Bursa, Turkey |
BOSEN CCPP was put into commercial operation in Simple Cycle mode based on the acceptance of ministry dated September, 2011.
BOSEN has awarded ENPRODE Engineering as Basic and Detailed Engineering CONTRACTOR for a 120 MW Power Plant investment. The Power plant shall be located within BOSEN’s existing plot area in Bursa Organized Industrial Zone. Design is based on gas turbine combined cycle technology and the plant will consist of two aero derivative gas turbines, one steam turbine, two vertical, drum-type HRSGs and one mechanical draft cooling tower which shall have enough capacity to serve the new plant as well as the already installed units.
BOSEN is a subsidiary of Bursa Organized Industrial Zone which is one of the largest industrial complexes in Turkey, constructed on a 3156 hectare area with 959 active companies employing over 100.000.
BOSEN already has a plant with 130 MW installed capacity under operation. The first combined cycle with 60 MW capacity had been commissioned in 1999 and the total capacity was increased to 130 MW with a second investment in 2006.
The new plant shall be the third capacity expansion investment of BOSEN and the final total capacity will be 250 MW.
|