AGE CCPP/200 MW Natural Gas Fired CCPP (3xSIEMENS SGT800 GTG + lxSTG)

OwnerAGE DENİZLİ Natural Gas and Electricity Production Inc.
Project LocationDenizli, Turkey
StatusCompleted

ENPRODE Project Responsibilities

• EPCM- Engineering, Procurement and Construction Management
• Bankable and Technical Feasibility Study
• Conceptual, Basic and Detail Engineering & Design
• Procurement Consulting
• Construction Management
• Commissioning and Start-up

AGE signed an agreement with ENPRODE Engineering in June 2010 for the Design, Engineering, Procurement and Construction Management (EPCM) of all project phases from the conceptual design up to commercial start-up of their 200 MW Combined Cycle Power Plant investment. The Power Plant was constructed on the land owned by AGE located in Sarayköy, which is a town 22 km to Denizli. The Plant configuration comprises; 3+1 Gas Turbine Combined Cycle technology and consists of three Gas Turbines, Heat Recovery Steam Generators (HRSG), one Steam Turbine and one Air Cooled Condenser (ACC) in accordance with the equipment performance. AGE CCPP was put into commercial operation in Simple Cycle mode on 27 July 2012 upon Ministerial Acceptance.

MAIN TECHNICAL PARAMETERS

Overall Plant Data

Gross power output-200 MWe
Gross electrlcal efficiency54.5%
Fuel typeNatural gas

GAS TURBINE

TypeSiemens SGT800
Site rating44877 kWe
Exhaust Gas Flow459 t/h
Exhaust Gas Temperature549 °C

Heat Recovery Steam Generator

TypeVertical Gas Flow,Drum - Type HRSG
Boilers (HP)Eco, Evaporator, Superheater
Boilers (LP)Eco, Evaporator, Superheater

Steam Turbine

TypeMulti-Stage Condensing Steam Turbine
ST power output64,5 MWe
HP Steam80 bar/520 °C
LP Steam7,5 bar/280 °C